Quantum DLT 8000 Manuale Pagina 60

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 59
Configuring, Installing, and Operating the Tape System
2-6 Quantum DLT 8000 Tape System
2.2.2 Setting TERM PWR
A SCSI bus must be terminated at each end of the bus. At least one device on the bus
must supply terminator power (TERM PWR).
To configure the DLT 8000 tape drive to supply TERM PWR, install a jumper block on
pin pair 3 / 4 (Figure 2-2).
Figure 2–2 Jumper Installed on Pin Pair 3 / 4 Enables Termination Power (TERM PWR)
Jumper on Pin Pair 3 / 4 enables
termination power (TERM PWR).
Front Bezel
Side View of Tape System
Vedere la pagina 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 407 408

Commenti su questo manuale

Nessun commento